Backdrop National Cranberry extract Cooperative (NCC) had experienced operational problems at Receiving Plant #1 (RP1) during the peak pick season inside the fall of 1995, which in turn had resulted in unhappiness from the owners with the Co-operatives and high time cost, inspite of the purchase of yet another dumper. To stop the same challenges in the approaching peak time, it is important to analyse the rose operations based upon predicted demands and help to make recommendations in the event that new equipment should be acquired before the fall of 1996. Problem

During the peak seasons, RP1 faces 2 crucial operational complications:

1 .

Very long idling time of trucks and drivers just before unloading all types of berries at the grow, and

installment payments on your High overtime cost due to the long grow operation several hours. The very long idling moments of trucks and drivers triggered extra cost and far unhappiness among the list of growers, who have are the owners of the cooperative. In spite of this kind of, NCC’s income are not afflicted. On the other hand, substantial overtime price will negate the earnings from the product sales of fruits, affect income and is a much more crucial trouble to be resolved. Plant Operations Analysis

The method flow plan for RP1 up to the parting processes, including the process and storage sizes, is demonstrated in Appendix A. Subsequent assumptions were made to compute the capabilities:

1 . You will find 2 constant flow operations in RP1, 1 pertaining to wet all types of berries and 1 for dry berries, installment payments on your Berries flow continuously in a constant charge throughout the whole process

three or more. There is minimal flow time at the receiving and screening process, plus the process can be trea

allen as an inventory, and 4. Trucks spend 7 to 8 mins to clear their contents and leave the platform and it was assumed that an common of 7. moments was required to unload a truck carrying 75 barrels of cranberries at each of the dropping units. The task capacities are calculated and shown in Table 1 . Process| Form of Berries Processed| Calculation| Ability (bbls/h)| Dumping| Dry/Wet| (75bbls / (7. 5 min/60)) * five units| 3, 000| Destoning| Dry| 1, 500bbls/h 5. 3 units| 4, 500| Dechaffing| Dry| 1, 500bbls/h * one particular units| 1, 500| Dechaffing | Wet| 1, 500bbls/h * 2 unit| a few, 000| Drying| Wet| 200bbls/h * a few units| six-hundred (Bottleneck)| Isolating | Dry/Wet| 400bbls/h 2. 3 units| 1, 200| Table 1 Processing Capacity

It truly is given that 16, 800 barrels of cherries are delivered in a common peak pick day, that 70% will be wet fruits and thirty percent are dried out berries. Through the entire 12 hours of receiving procedure, the demand to get wet cherries is 980 barrels each hour and that intended for dry all types of berries is four-twenty barrels per hour. The total with regard to all the berries is you, 400 barrels per hour. Table 2 shows the implied utilization for every single of the procedures. Process| Form of Berries Processed| Calculation| Implied Utilization (%)| Dumping| Dry/Wet| 1, 4 hundred / a few, 000| 47| Destoning| Dry| 420 / 4, 500| 9| Dechaffing| Dry| four twenty / you, 500| 28|

Dechaffing | Wet| 980 / several, 000| 33| Drying| Wet| 980 / 600| 163 (Bottleneck)| Separating | Dry/Wet| 1, 400 / you, 200| 117| Table 2 Implied Utilization From the intended utilizations, it had been determined the operations at RP1 is process limited, with the capabilities of both drying and separating techniques lower than their demands. It absolutely was also determined that the blow drying process may be the bottleneck from the operations and may require 63% more capacity to process the need of moist berries. While not the logjam, the isolating process needs 17% more capacity to procedure the demand of berries.

NCC is concerned about the overtime cost received from the maximum harvest time of year and the flower operation period would be established to address this kind of concern. One more concern may be the waiting coming back the trucks and drivers before unloading berries in the dumpers as well as the waiting period required for the very last truck will be determined. The following assumptions were created:

1 . You will discover no fruits inside the keeping bins prior to operations start each day

2 . There is no nonproductive time between processes and all operations are able to operate at complete capacity

three or more. Due to the top season, the drier operators will start work at six: 00am

5. As the bottleneck method is the a single processing rainy berries, possessing bins #17 ” twenty-four would be utilized to hold wet berries simply to optimise herb operations thus making total wet all types of berries holding capacity to be a few, 200 barrels, and

5. Trucks will arrive at RP1 at a constant interval over a period of 12 hours starting from 7am. Physique 1 illustrates the plant procedure time and the truck ready time.

Truck waiting time Area sama dengan? (1360bbl) times (5. 85/75) hrs. = 53hrs 800bbls/h 380bbls/h 00bbls/h 3200 six: 00am zero 7: 00pm 7: 00am 3: 25pm 4560 two: 36am Period (hours) Keeping Wet Containers Capacity 3 dryers four dryers your five dryers 2160 9: 42pm 180bbls/h 1680 9: 00pm 840bbls/h 140bbls/h 9: 16pm Wet Containers (barrels) Berries waiting upon trucks Number 1 Process Flow of Wet Berries at RP1 In the current flower setup high are only three or more dryers, the holding receptacles will be chock-full at 380 barrels hourly, which is the excess demand stream rate (980 barrels per hour) within the process capacity (600 barrels per hour). At this rate, the rainy bins will be completely stuffed at a few: 25pm.

By 7: 00pm, when the last truck has arrived at RP1, 4, 560 barrels of wet all types of berries would have built up, of which you, 360 barrels would be around the trucks. With all the plant control rate of 600 barrels per hour, the trucks can be emptied simply by 9: 16pm with the last truck having waited pertaining to 2 hours sixteen minutes. The entire process prevents at two: 36am, while using total processing time of 19 hours thirty-six minutes. Potential Solutions Installing a new drier will increase the drying capacity to 800 barrels per hour yet this process can still remain the logjam (with implied utilization of 123%).

In a standard peak pick day with 16, 800 barrels of berries delivered, the rate of accumulation of wet berries is decreased to one hundred and eighty barrels hourly and an overall total of 2, 160 barrels will be accumulated by 7: 00pm. The entire operation will total at on the lookout for: 42pm, while using total control time of 14 hours 42minutes (Figure 1). At the same time, there would be no truck waiting time as the holding bins will not be chock-full completely just before 7: 00pm. To determine financial savings, the following assumptions were made: 1 ) 2 changes will be implemented during the maximum season and overtime is definitely paid following 11: 00pm

2 . The method capacity of RP1 is definitely not troubled by the execution of the shifts, 3. Staff would be taken care of the full move (8 several hours a day) even if plant operations end before 14: 00pm, and 4. Just 8-9 periodic workers would be used to do overtime and an average of 8. five workers can be used for measurements. With the current RP1 set up, overtime value is $37, 087 (8. five workers by $12 each hour x 3. 6 overtime, however, hours times 101 peak season days). With the extra dryer, simply no overtime will probably be required and the cost savings is $37, 087. The cost of the drier ($60, 000) exceeds the cost savings for the coming season.

As such, NCC’s investment inside the dryer will probably be recovered in 1 . 6th seasons ($60, 000/$37, 087) and net cost savings through the additional clothes dryer will be developed during the 1997 peak time of year. Another option to improve the process is always to install two additional washer dryer combos that would increase the drying capacity to 1, 000 barrels hourly and the drying process will not be the logjam anymore (with 98% intended utilization). The brand new bottleneck is definitely the separating method. At this point, the interest rate of accumulation of cherries will be 200 barrels hourly resulting in 2, 400 barrels of fruits accumulating inside the bins simply by 7: 00pm.

Of these, you, 680 barrels are rainy berries and 720 barrels are dry out. After 7: 00pm, most berries will probably be separated in 2 hours (2, 400/1, 200). The entire operation will total at being unfaithful: 00pm (Figure 1). There would be no pickup truck waiting time as both equally wet and dry having bins are not filled up completely. Installing the second additional dryer would cost yet another $60, 000 yet would profit only by simply reducing the total processing period by forty two minutes compared to the processing period achieved by putting in one further dryer.

This reduction in time is certainly not considerable in comparison to the capital that would be invested to set up the second additional dryer. Therefore this option might not be viable to pick. The third choice to consider is usually to convert several of holding receptacles for the dry cherries to hold wet berries by a cost of $10, 500 per bin. This option will decrease the waiting moments of the trucks but does not reduce the overtime cost intended for the plant as the logjam capacity can be not improved and procedure will continue to end for 2: 36am.

Recommendation Following analyzing all 3 options, it is recommended that one additional drier be installed. This will eliminate both the need for overtime bills and the waiting time for pickup trucks and motorists at a minor cost. You will see overtime cost savings of $37, 087 as compared with the current flower setup. Farmers will also save on truck rental cost even though it does not have an effect on the profits of NCC. The fee will be recovered in 1 . 6 seasons and is supposed to turn out as a good long-term investment.

The additional dryer increases the effectiveness of RP1 and simplicity the process constraints in businesses. Appendix A , Procedure Flow Plan Dumping 5units x 75/(7. 5/60) = 3, 000bbls/h D Holding Bin #1-16 16, 250=4000bbls W D/W Holding Bin #17-24 8, 250=2000bbls Holding Bin #25-27 3, 400=1200bbls Destoning 3units x one particular, 500 sama dengan 4, 500bbls/h Dechaffing 1unit x one particular, 500 sama dengan 1, 500bbls/h Dechaffing 2units x one particular, 500 sama dengan 3, 000bbls/h Separating 3units x 400 = you, 200bbls/h Drying out 3units back button 200 sama dengan 600bbls/h Bailey Mills 3units x 500 = one particular, 200bbls/h Delivery Area Convenience Area Vehicles Dry Cherries Wet Fruits Dry/Wet All types of berries